Unit 2 What is the best way to travel
第二课时
Ⅰ.根据句意及首字母提示补全单词
1.I will have a long train j from Beijing to Tibet(西藏).
2.Excuse me, can I p my car in the parking lot
3.It’s too cold.Don’t make children stay o the classroom.
4.The new phone c him about 3,000 yuan.
5.The little boy is only six years old. H , he can speak English well.
Ⅱ.用括号内所给单词的适当形式填空
6.We’re (plan) to travel from Zhengzhou to Hangzhou.
7.The more you eat, (fat) you’ll be.
8.The Yellow River is the second (long) river in China.
9.It took her about two hours (clean) her bedroom.
10.Linda thinks travelling by plane is the best way (get) there.
Ⅲ.用方框中所给单词或短语的适当形式填空
choose, cheap, much, wait for
11.We should not leave right now, but a reply(答复).
12.Travelling by coach is way to go there, but it takes the most time.
13.Boys and girls, now it’s your turn(机会) to make your own .
14.The junk food(垃圾食品) you eat, the unhealthier you will be.
Ⅳ.单项填空
( )15.Liu Bei’s arms are the longest the three.
A.in B.of C.on D.at
( )16.Nanjing isn’t so large Shanghai. However, it’s the second city in East China.
A.like; largest B.as; largest C.like; large D.as; large
( )17.We go to school Monday Friday.
A.between; to B.from; to
C.from; with D.between; for
( )18.I live the market. So I have to drive to buy vegetables and fruit.
A.far away B.near to
C.far from D.close to
Ⅴ.阅读理解
China’s fastest subway train—travelling at 160 kilometres an hour—appeared first in Guangzhou, the capital of South China’s Guangdong Province, on September 25, 2020.
The subway train will be put into service on Guangzhou Metro’s No.18 and No.22 metro(地铁) lines. These two lines are now still under construction. Once people put them into service, it will take only 25 minutes and 30 minutes from Nansha Free Trade Zone to the South Guangzhou Train Station and East Guangzhou Train Station.
The two lines will extend to Guangdong’s Zhuhai, Zhongshan and Dongguan cities in the future.
The train manufactured(制造) by CRRC Zhuzhou Locomotive Co., Ltd is also the first subway to travel at 160 kilometres an hour in the Guangdong-Hong Kong-Macao Greater Bay Area.
The train uses the most advanced design techniques, technological protocols(协议) and innova-tion(创新). It also introduces an intelligent operation and maintenance system(智能运维系统) based on big data and cloud computing.
The Guangzhou railway authority(官方) has ordered 40 such trains to run on its No.18 and No.22 lines from CRRC.The next delivery after the first train began in October, 2020.
( )19.The underlined word “construction” means “ ” in Chinese.
A.控制 B.建设 C.运行 D.试运
( )20.How many such trains will run on No.18 and No.22 lines
A.40. B.35. C.30. D.25.
( )21.Which of the following is TRUE according to the passage
A.It takes 25 minutes from Zhuhai to Guangzhou.
B.People have already used Guangzhou Metro’s No.18 line.
C.In October, the No.22 line will begin to run.
D.People build the fastest subway train with the most advanced design techniques.
( )22.The passage above may be from .
A.an interesting story
B.a relaxing movie
C.a piece of news
D.a science book
答案
Ⅰ.1.journey 2.park 3.outside
4.cost 5.However
Ⅱ.6.planning 7.the fatter 8.longest
9.to clean 10.to get
Ⅲ.11.wait for 12.the cheapest
13.choices 14.more
Ⅳ.15.B of the three是表示范围的短语,意为“三个当中”。
16.B not as/so…as是固定搭配,意为“和……不一样”;序数词后的形容词用最高级形式。
17.B from…to…是固定搭配,意为“从……到……”。
18.C
Ⅴ.【主旨大意】 2020年9月25日,时速160公里的地铁列车首次出现在中国南部广东省省会广州。这种地铁列车将在广州地铁18号线和22号线投入运营。
19.B 词义猜测题。由下文的“Once people put them into service, it will take only 25 minutes and 30 minutes…”可知,这两条线还没有运行。由此可知,是在“建设”中。故选B。
20.A 细节理解题。由最后一段第一句可知,广州铁路局已从CRRC订购40辆这样的列车在18号线和22号线上运行。故选A。
21.D 细节理解题。由倒数第二段中的“The train uses the most advanced design techniques…”可知,列车采用最先进的设计技术。
22.C 推理判断题。通读全文可知,这是一则新闻。故选C。